- Does the handover inspection cost extra?
- No. It is part of how every Surefoot project finishes, included in the project price.
- How long does the handover walk-round take?
- As long as the project needs. A garden wall is quick; a full garden transformation or extension shell takes longer, and we do not rush it.
- What happens if I find a problem after handover?
- The work is covered by a 2-year workmanship guarantee, with a 10-year warranty available on request. Contact us and we will deal with it.
- Who attends the inspection?
- You and a member of our team who worked on the project, so questions are answered by someone who was actually on site.
- What if I am not available on the completion day?
- We arrange handover for a time you can attend. The point is that you see the work with us, so it is worth scheduling properly.
- Do trade clients get a handover inspection too?
- Yes. Builders and developers get the same walk-round and sign-off as homeowners.
- Can you walk each phase of a larger project?
- Yes. On phased projects we can inspect and sign off each stage as it completes rather than waiting until the end.
- What does the 2-year guarantee cover?
- It is a workmanship guarantee on the work we carried out. If you want the specific scope confirmed in writing for your project, ask and we will set it out.
- Is a 10-year warranty available?
- Yes, a 10-year warranty is available on request. Raise it before work starts so it can be confirmed for your project.
- Which areas does this apply to?
- Every project we deliver, across Doncaster, Sheffield, Rotherham, Barnsley, Scunthorpe, Leeds, Wakefield, York, Pontefract, Worksop, Selby and Goole.